Extension and upgrade of an operational industrial complex with site urbanisation

IDILIA · Parets del Vallès

  • Refurbishment
  • Civil works
  • Industrial
  • Infrastructure
  • Sustainability

The Idilia project, located in the industrial estate of Parets del Vallès, involves a comprehensive intervention on an operational industrial complex, combining the extension of facilities, the adaptation of existing spaces and the urbanisation of the surrounding environment.

The intervention integrates multiple actions within a single production site: the extension of the handling warehouse, the refurbishment of an existing building, the urbanisation of the complex and the construction of a new recycling facility for waste management.
The main challenge of the project has been working within an active industrial plant, ensuring uninterrupted production while minimising disruption throughout the execution of the works.
From a technical perspective, the project has required precise coordination between civil works, building construction and installations, as well as structural and functional integration between the new extensions and the existing buildings. External urbanisation has been designed to ensure the logistical efficiency of the site, with particular attention to access routes, circulation flows and service networks.

  • Year: 2025
  • Duration (months): 12
  • Location: Parets del Vallès
  • Surface area (m2): Urbanisation (5,760.22 m²)
    Recycling facility (971.89 m²)
    Refurbishment of existing warehouse (867.35 m²)
    New warehouse (968.60 m²)
  • Developer: Idilia
  • Architecture: ARQUID, S.L.P. / ABM Consulting
  • Photography: Argot Photo
DOWNLOAD DOSSIER
idilia-industrial-cardoner
  • Expand the plant’s operational capacity

    Deliver the extension of the handling warehouse to support the growth of production activity.

  • Adapt existing facilities to new requirements

    Upgrade existing spaces to accommodate new production processes and current regulatory standards.

  • Ensure continuity of industrial operations

    Plan and execute the works while minimising impact on an active facility, maintaining full operability throughout the process.

idilia-industrial-cardoner
We have brought to fruition

An expanded and fully operational industrial complex without interrupting production

  • The extension of the handling warehouse, refurbishment of existing buildings, construction of a new recycling facility and full site urbanisation, resulting in a functional industrial environment ready for ongoing activity.
  • The integration of new interventions within a working plant, coordinating construction phases and production processes to minimise disruption and ensure continuity.
  • Through the simultaneous management of civil works, building construction and installations, structural integration of extensions and the delivery of urbanisation works based on logistical and operational criteria.